This work shall consist of the removal and disposal of building(s), including all foundations, retaining walls, and piers, down to a plane 1 ft (300 mm) below the ultimate bottom of building elevation or proposed bottom of construction elevation. Removals shall include all existing utilities, sidewalks, driveways, decks, landscaping, and trees as indicated on the construction drawings and as directed by the Village or their representative.
Status
Accepting Bids
Bid Date | 8/8/25 10:00am CDT |
Location
218 Adams St., 404 N. 4th St., & 510 S. 4th St. - Malta, IL
BID DUE DATE:
Friday, August 8, 2025 – 10:00AM
Village of Malta – Village Hall
Office of the Village Clerk
302 S. Second St., Malta, IL 60150
Bidders are responsible for the purchase of complete printed sets and/or complete downloads
Bid Documents are NOT available to Plan Rooms through BHFX