City of Belvidere - 5th and Allen GIGO Pond
Improvements include excavation for a retention/detention pond, including new 72” RCP storm sewer with end sections and cast-in-place energy dissipation structure. This project includes the removal/abandonment of +/-375 L.F. of 72” storm sewer. Excess material will be taken off site and spread per the off site grading exhibit.
Plans
(click to expand/collapse)

Name | Size | ||
Sheet 1 of 8 | 1.0 MB | ||
Sheet 2 of 8 | 831.8 KB | ||
Sheet 3 of 8 | 669.6 KB | ||
Sheet 4 of 8 | 1.7 MB | ||
Sheet 5 of 8 | 2.6 MB | ||
Sheet 6 of 8 | 1.8 MB | ||
Sheet 7 of 8 | 2.7 MB | ||
Sheet 8 of 8 | 2.2 MB |