Harper College - Building S Electrical Service Upgrade
Work includes (but is not limited to) the following: The separating of Buildings STU power metering from Building A by replacing the existing switchboard MSB-S with an 800 amp switchboard and powering the existing distribution panel DP-U from the new MSB-S switchboard.
Plans
(click to expand/collapse)
