Harper College - Building S Electrical Service Upgrade

Work includes (but is not limited to) the following: The separating of Buildings STU power metering from Building A by replacing the existing switchboard MSB-S with an 800 amp switchboard and powering the existing distribution panel DP-U from the new MSB-S switchboard.
Plans (click to expand/collapse)
Name Size
01_G0.1 269.8 KB
02_E0.1 153.3 KB
03_ED1.1 217.0 KB
04_E1.1 215.5 KB
05_E5.1 195.2 KB